We providing consultantation service to Dana Shwe La Min Co.,Ltd and Eagle Land Logistics Co.,Ltd for container 8 shipments, total container (67) unit starting from 18th April 2019 under the department of bridge, Ministry of construction. Although these cargo are mostly steel structure for Kim Chaung bridge at Rakhine State which packed in 40ft HC container, 20ft refeer container (1) unit is special for painting. The services which we provide for this project are as follows;

Taking the cargo from 40ft HC container by 60ton Knuckle Boom crane
Loading by 180 ton mobile crane at handling area
Preparation & loading at Myat Noe Thu Jetty by 50ton crane

20FT REEFER CONTAINER

We were planing to send the painting material to project site by 20ft reefer truck at the beginning of project.Luckily, it was SOW (Shipper Owner) which means we can use the reefer container at project site and we changed our logistics mode to send with steel structure by ship.We installed with electrician at jetty’s power line to get cold chain temperature setting 24.6 -25 Degree Centigrade as soon as the reefer container departed from Htee Dan port. We rented the generator which is regular power supply and constant frequency and installed the temporary power line at ship to get the power along the trip.

20FT reefer container truck near power line at Jetty
Electricians installed the power line to reefer container
Standard Cold Chain Temperature 24.6-25 ံC
Generator stand by on the ship
Unloading condition of 20ft reefer container on the ship

This is difficult because the rack is made of pine wood instead of iron frame. So, the sling (steel wire) cut off while loading and the bundle of cargo is broken. The crane operator is used to take out the cargo with iron rack , we have to advice to smooth the operation without damage cargo especially the painting of steel structure.